| >> Download folder (.pdf)
Terminal infrastructure
| Common information |
|
|
Road |
|
| RoLa ramp |
|
|
Parking area (semi trailer units)
(only for RoLa) |
50 |
| |
|
|
Access to high level road net |
A12, B170, |
| Rail |
|
|
|
B171, B312 |
| Total length of railway siding |
1,000 m |
|
Near highway |
A12 'Wörgl West' |
| Maximum train length |
500 m |
|
|
|
| Maximum of trains treated in parallel |
2 |
|
Services |
|
| 2 Loading tracks |
500 m |
|
RoLa devices |
|
| |
|
|
RoLa services |
|
To view and print
the Hub Folder PDF you'll need Adobe Acrobat.
If you haven't already installed Adobe Acrobat, click here for download:
Get
Acrobat
Um die .PDF Dateien
korrekt ansehen zu können, benötigen Sie Adobe Acrobat.
Sollten Sie diesen nicht installiert haben, dann klicken Sie bitte hier
zum downloaden:
Acrobat Reader
The information
specified in the individual documents is based on data produced by the
hub operator.
Both the Federal Ministry of Transport, Innovation and Technology and
Bohmann Publishing House shall not accept any liability for correctness.
|