Bimodal: Rail - Road

>> Download folder (.pdf)

Terminal infrastructure

Common information Container  
Transshipment area general cargo     Container storage yard 2,500 TEU
RoLa ramp       (35,000 m2)
Container terminal     Empty container / Depot  
Container dispatch 20', 30'      
  40', 45'   Transshipment Lifting capacity
      2 Gantry crane 40 t
Swap bodies dispatch     1 Fork lifter 10 t
Semi-Trailers dispatch     3 Reach stackers 45 t
         
Storage facilities     Further transshipment devices  
Cold storage     RoLa ramp for trucks  
         
Rail     Services  
Total length of railway siding
(RoLa & combined traffic)
5.600 m   Quality control  
Maximum train length 580 m   Customs office  
Maximum of trains treated in parallel 10   Dangerous goods handling  
6 Loading tracks 580 m   Unaccompanied combined traffic  
5 Loading tracks 350 – 450 m   - Transshipment  
  (RoLa)   - Maintenance facilities  
      Parcel service  
Road     RoLa devices  
Parking area (semi trailer units)
(only for RoLa)
250 trucks   Container maintenance  
11 Loading tracks 400 - 580 m   Container stuffing and stripping
(operated by crane, fork lift & RoLa)   Container cleaning  
Access to high level road net: B138, A25 close to B1      
Near highways: A25, A1, close to A8, A9      

To view and print the Hub Folder PDF you'll need Adobe Acrobat.
If you haven't already installed Adobe Acrobat, click here for download: Get Acrobat

Um die .PDF Dateien korrekt ansehen zu können, benötigen Sie Adobe Acrobat.
Sollten Sie diesen nicht installiert haben, dann klicken Sie bitte hier zum downloaden: Acrobat Reader

The information specified in the individual documents is based on data produced by the hub operator.
Both the Federal Ministry of Transport, Innovation and Technology and Bohmann Publishing House shall not accept any liability for correctness.

Webdesign: BLAUGRAU MEDIA GmbH Wochenzeitschrift für Logistik und Transport