Bimodal: Rail - Road

>> Download folder (.pdf)

Terminal infrastructure

Common information Transshipment Lifting capacity
Transshipment area general cargo   2 Fork lifter < 35 t
Transshipment area bulk cargo   3 Fork lifter > 5 t
Container terminal   2 Reach stackers 45 t
Container dispatch 20', 30', 40'   Reach stacker with spreader and piggy back
  45'
(in the future)
     
Swap bodies dispatch (in the future)   Further transshipment devices  
Semi-Trailers dispatch (in the future)     Wheel-loader  
Commercial vehicle car wash located      
    Transshipment capacity
Storage facilities   Bulk cargo 50 t/h
Covered storage area 4,500 m2   General cargo 100 t/h
      Container 30 TEU/h
    Max. total transshipment volume 200 TEU/d
Rail      
Total length of railway siding 1,067 m    
Maximum train length 330 m   Services
Maximum of trains treated in parallel 1   Heavy lift
2 Loading track ca. 330 m   Quality control
      Unaccompanied combined traffic
Road   - Transshipment
Parking area (semi trailer units) 78   - Maintenance facilities  
3 Loading tracks 350 m   Container maintenance  
Access to high level road net 1,5 km   Container repair shop  
Near highways S6, S36, S35      
      Container
      Container storage yard
      Empty container / Depot

To view and print the Hub Folder PDF you'll need Adobe Acrobat.
If you haven't already installed Adobe Acrobat, click here for download: Get Acrobat

Um die .PDF Dateien korrekt ansehen zu können, benötigen Sie Adobe Acrobat.
Sollten Sie diesen nicht installiert haben, dann klicken Sie bitte hier zum downloaden: Acrobat Reader

The information specified in the individual documents is based on data produced by the hub operator.
Both the Federal Ministry of Transport, Innovation and Technology and Bohmann Publishing House shall not accept any liability for correctness.

Webdesign: BLAUGRAU MEDIA GmbH Wochenzeitschrift für Logistik und Transport