| >> Download folder (.pdf)
Terminal infrastructure
| Common information |
|
|
Container |
|
| Transshipment area general cargo |
|
|
Container storage yard |
120 TEU |
| Car terminal |
|
|
Empty container / Depot |
1,000 TEU |
| Container terminal |
|
|
|
|
| Container dispatch |
20', 30' |
|
Transshipment |
Lifting capacity |
| |
40', 45' |
|
2 Mobile cranes |
|
| Swap bodies dispatch |
|
|
1 Fork lifter |
< 3 t |
| Semi-Trailers dispatch |
|
|
1 Fork lifter |
3 - 5 t |
| |
|
|
1 Fork lifter |
> 5 t |
| Storage facilities |
|
|
|
|
| Covered storage area |
11,000 m2 |
|
Further transshipment devices |
|
| Racks |
10,390 units |
|
Paper clamps |
|
| Open storage area |
112,000 m2 |
|
|
|
| Special storage |
|
|
Transshipment capacity |
|
| Customs storage |
|
|
General cargo |
60 t/h |
| Cold storage |
1,500 m2 |
|
Container |
20 TEU/h |
| |
|
|
Max. total transshipment volume |
200 TEU/d |
| Rail |
|
|
|
|
| Total length of railway siding |
|
|
Services |
|
| Containerterminal |
1,800 m |
|
Heavy lift |
45 t |
| Kfz terminal |
1,000 m |
|
Quality control |
|
| Maximum train length |
600 m |
|
Bureau Veritas Quality International - BVQI |
| Maximum of trains treated in parallel |
1 |
|
ISO 9001:2000 |
|
| 3 Loading tracks |
400 m |
|
Customs office, Gebr. Weiss GmbH |
| |
|
|
Dangerous goods handling |
|
| Road |
|
|
Unaccompanied combined traffic |
|
| 1 Loading track |
200 m |
|
- Transshipment |
|
| Access to high level road net: Löfflerweg
20 m |
|
- Maintenance facilities, Gebr. Weiss GmbH |
| |
|
|
Dangerous goods preparation facilities
Gebr. Weiss GmbH |
| Near highways: A12 (Inntalautobahn) |
100 m |
|
Cooling units service |
|
| |
|
|
Container maintenance internal |
|
| |
|
|
Container cleaning internal |
|
To view and print
the Hub Folder PDF you'll need Adobe Acrobat.
If you haven't already installed Adobe Acrobat, click here for download:
Get
Acrobat
Um die .PDF Dateien
korrekt ansehen zu können, benötigen Sie Adobe Acrobat.
Sollten Sie diesen nicht installiert haben, dann klicken Sie bitte hier
zum downloaden:
Acrobat Reader
The information
specified in the individual documents is based on data produced by the
hub operator.
Both the Federal Ministry of Transport, Innovation and Technology and
Bohmann Publishing House shall not accept any liability for correctness.
|