| >> Download folder (.pdf)
Terminal infrastructure
| Common information |
|
|
Transshipment |
Lifting capacity |
| Transshipment area general cargo |
|
|
Mobiler |
|
| Transshipment area bulk cargo |
|
|
1 Gantry crane |
40 t |
| Ro-Ro ramp |
|
|
1 Mobile crane |
12 t |
| Car terminal |
|
|
4 Bridge cranes |
6,3 - 40 t |
| Grain terminal |
|
|
26 Fork lifter |
< 3 t |
| Container terminal |
|
|
2 Fork lifter |
3 – 5 t |
| Container dispatch |
20', 30' |
|
10 Fork lifter |
> 5 t |
| |
40', 45' |
|
10 empty fork lifts |
|
| Swap bodies dispatch |
|
|
8 Reach stackers |
|
| Semi-Trailers dispatch |
|
|
|
|
| |
|
|
Further transshipment devices |
|
| Storage facilities |
|
|
Pneumatic equipment |
|
| Common |
|
|
Ro-Ro ramp for cars |
|
| Covered storage area |
70,000 m2 |
|
Ramp for trucks |
|
| Racks |
12,500 m2 |
|
2 Lumber stackers |
|
| Open storage area |
270,000 m2 |
|
1 Paper clamp |
|
| Special storage |
2,900 m2 |
|
Pump |
|
| Customs storage |
55,000 m2 |
|
|
|
| Free port zone |
245,000 m2 |
|
Transshipment capacity |
|
| |
|
|
Bulk cargo |
360 t/h |
| Storage facilities |
|
|
General cargo |
200 t/h |
| Silos |
|
|
Container |
125 TEU/h |
| Grain silos |
25,000 m3 |
|
Max. total transshipment volume |
1,500 TEU/d |
| Tanks |
|
|
|
|
| Crude oil |
200,000 m3 |
|
Services |
|
| |
|
|
Quality control |
|
| Rail |
|
|
Customs office |
|
| Total length of railway siding |
50,000 m |
|
Dangerous goods handling
|
|
| Maximum train length |
700 m |
|
|
|
| Maximum of trains treated in parallel |
15 |
|
Unaccompanied combined traffic |
|
| 15 Loading tracks |
up to 700 m |
|
- Transshipment |
|
| Wiencont and the three ports Albern, Freudenau and Lobau |
|
|
Cooling units service |
|
| |
|
|
Ro-Ro devices |
|
| Road |
|
|
Ro-Ro service |
|
| Parking area (semi trailer units) |
5,000 m2 |
|
|
|
| 30 Loading tracks |
600 m |
|
Container maintenance |
|
| Access to high level road net 5km: |
A21, A23, A4 |
|
Container stuffing and stripping |
|
| Near highways |
A21, A23, A4 |
|
Container repair shop |
|
| |
|
|
Container cleaning |
|
| Ship |
|
|
Container rent and trade |
|
| 3 basins |
150 berths |
|
|
|
| Operational shore zone |
13,100 m2 |
|
Services by other companies |
|
| Length of quay |
13,000 m |
|
Customs office |
|
| Water depth |
2.5 m |
|
T-Sped Speditionsges.m.b.H. |
|
| Permissible draught |
1 – 5 m |
|
E-Mail: office@wiencont.com |
|
| |
|
|
www.wiencont.at |
|
| Container |
|
|
|
|
| Container storage yard |
6,500 TEU
|
|
Dangerous goods handling |
|
| |
Wiencont |
|
T-Sped Speditionsges.m.b.H. |
|
| Empty container / Depot |
|
|
www.wiencont.at |
|
| empty and full together |
|
|
|
|
| |
|
|
|
|
| |
|
|
|
|
To view and print
the Hub Folder PDF you'll need Adobe Acrobat.
If you haven't already installed Adobe Acrobat, click here for download:
Get
Acrobat
Um die .PDF Dateien
korrekt ansehen zu können, benötigen Sie Adobe Acrobat.
Sollten Sie diesen nicht installiert haben, dann klicken Sie bitte hier
zum downloaden:
Acrobat Reader
The information
specified in the individual documents is based on data produced by the
hub operator.
Both the Federal Ministry of Transport, Innovation and Technology and
Bohmann Publishing House shall not accept any liability for correctness.
|