| >> Download folder (.pdf)
Terminal infrastructure
| Common information |
|
|
Container |
|
| Transshipment area general cargo |
|
|
Container storage yard |
3,500 TEU |
| Transshipment area bulk cargo |
|
|
Empty container / Depot |
|
| Ro-Ro ramp |
|
|
|
|
| Car terminal |
|
|
Transshipment |
Lifting capacity |
| Grain terminal |
|
|
1 Gantry crane |
32 t |
| Container terminal |
|
|
Mobile Crane possible use, up to 200 t |
| Container dispatch |
20', 30', |
|
1 RTG |
40 t |
| |
40', 45' |
|
9 Fork lifter |
< 3 t |
| (45’ dispatch, for ship transshipment only) |
|
1 Fork lifter |
3 – 5 t |
| Swap bodies dispatch |
|
|
2 Fork lifter |
> 5 t |
| Semi-Trailers dispatch |
|
|
5 Reach stackers |
10 – 45 t |
| |
|
|
5 Spreader |
|
| Storage facilities |
|
|
3 rotating cranes |
4 – 15 t |
| Common |
|
|
1 side reloader |
|
| Covered storage area |
110,000 m2 |
|
3 container chassis |
|
| Racks |
10,861 m2 |
|
2 reloaders for general cargo |
3 t |
| Open storage area |
10,000 m2 |
|
|
|
| Storage for hazardous materials |
5,730 m2 |
|
|
|
transshipment and temporary storage only |
|
Further transshipment devices |
|
| Special storage |
5,131m2 |
|
Conveyor belt |
|
| Customs storage |
25 m2 |
|
Pneumatic equipment |
|
| Free port zone (small spaces in the port) |
|
Ro-Ro ramp for cars |
|
| Cold storage |
|
|
Ramp trucks |
|
| Cold storage temperature |
|
|
Paper clamps |
|
| |
|
Pump – service available at the oil companies
located |
| Silos |
|
|
|
|
| Grain silos |
2 Silos
ca. 7,000 t |
|
Transshipment capacity |
|
| |
|
|
Heavy lift |
|
| Tanks |
|
Quality control |
|
| Crude oil |
300,000 m3 |
|
Bulk cargo |
150 t/h |
| |
|
|
General cargo |
50 t/h |
| Rail |
|
|
Container |
40 TEU/h |
| Total length of railway siding |
27,000 m |
|
Max. total transshipment volume |
1,000 TEU/d |
| Maximum train length |
630 m |
|
|
|
| Maximum of trains treated in parallel |
2 |
|
Service |
|
| 2 Loading tracks |
400 - 500 m |
|
Heavy lift |
|
| |
|
|
Quality control |
|
| Road |
|
|
Bridge scales |
|
| Parking area (semi trailer units) |
3,000 m2 |
|
Customs office |
|
| 2 Loading tracks |
800 m |
|
Dangerous goods handling |
|
| Access to high level road net |
B3, B125, |
|
Tank container cleaning - no dangerous goods |
| |
B129, B1 |
|
Unaccompanied combined traffic |
|
| Near highways: |
|
|
- Transshipment |
|
| 2 km to A7, 10 km to A1 |
|
|
- Maintenance facilities |
|
| |
|
|
Dangerous goods preparation facilities |
|
| Ship |
|
Cooling units service |
|
| 6 basins |
35 berths |
|
Ro-Ro Devices |
|
| Operational shore zone |
10,000 m2 |
|
Ro-Ro Service - Ro-Ro ramp |
|
| Length of quay |
9,304 m |
|
Container maintenance |
|
| Water depth |
7 m |
|
Container stuffing and stripping |
|
| Permissible draught |
2.7 m |
|
Container repair shop |
|
| |
|
|
Container cleaning |
|
To view and print
the Hub Folder PDF you'll need Adobe Acrobat.
If you haven't already installed Adobe Acrobat, click here for download:
Get
Acrobat
Um die .PDF Dateien
korrekt ansehen zu können, benötigen Sie Adobe Acrobat.
Sollten Sie diesen nicht installiert haben, dann klicken Sie bitte hier
zum downloaden:
Acrobat Reader
The information
specified in the individual documents is based on data produced by the
hub operator.
Both the Federal Ministry of Transport, Innovation and Technology and
Bohmann Publishing House shall not accept any liability for correctness.
|