Trimodal: Rail - Road - Ship

>> Download folder (.pdf)

Terminal infrastructure

Common information Container  
Transshipment area general cargo     Container storage yard 3,500 TEU
Transshipment area bulk cargo     Empty container / Depot  
Ro-Ro ramp        
Car terminal     Transshipment Lifting capacity
Grain terminal     1 Gantry crane 32 t
Container terminal     Mobile Crane possible use, up to 200 t
Container dispatch 20', 30',   1 RTG 40 t
  40', 45'   9 Fork lifter < 3 t
(45’ dispatch, for ship transshipment only)   1 Fork lifter 3 – 5 t
Swap bodies dispatch     2 Fork lifter > 5 t
Semi-Trailers dispatch     5 Reach stackers 10 – 45 t
      5 Spreader  
Storage facilities     3 rotating cranes 4 – 15 t
Common     1 side reloader  
Covered storage area 110,000 m2   3 container chassis  
Racks 10,861 m2   2 reloaders for general cargo 3 t
Open storage area 10,000 m2      
Storage for hazardous materials 5,730 m2      
transshipment and temporary storage only
  Further transshipment devices  
Special storage 5,131m2   Conveyor belt  
Customs storage 25 m2   Pneumatic equipment  
Free port zone (small spaces in the port)   Ro-Ro ramp for cars  
Cold storage     Ramp trucks  
Cold storage temperature     Paper clamps  
    Pump – service available at the oil companies located
Silos        
Grain silos 2 Silos
ca. 7,000 t
  Transshipment capacity  
      Heavy lift  
Tanks   Quality control  
Crude oil 300,000 m3   Bulk cargo 150 t/h
      General cargo 50 t/h
Rail     Container 40 TEU/h
Total length of railway siding 27,000 m   Max. total transshipment volume 1,000 TEU/d
Maximum train length 630 m      
Maximum of trains treated in parallel 2   Service  
2 Loading tracks 400 - 500 m   Heavy lift  
      Quality control  
Road     Bridge scales  
Parking area (semi trailer units) 3,000 m2   Customs office  
2 Loading tracks 800 m   Dangerous goods handling  
Access to high level road net B3, B125,   Tank container cleaning - no dangerous goods
  B129, B1   Unaccompanied combined traffic  
Near highways:     - Transshipment  
2 km to A7, 10 km to A1     - Maintenance facilities  
      Dangerous goods preparation facilities  
Ship   Cooling units service  
6 basins 35 berths   Ro-Ro Devices  
Operational shore zone 10,000 m2   Ro-Ro Service - Ro-Ro ramp  
Length of quay 9,304 m   Container maintenance  
Water depth 7 m   Container stuffing and stripping  
Permissible draught 2.7 m   Container repair shop  
      Container cleaning  

To view and print the Hub Folder PDF you'll need Adobe Acrobat.
If you haven't already installed Adobe Acrobat, click here for download: Get Acrobat

Um die .PDF Dateien korrekt ansehen zu können, benötigen Sie Adobe Acrobat.
Sollten Sie diesen nicht installiert haben, dann klicken Sie bitte hier zum downloaden: Acrobat Reader

The information specified in the individual documents is based on data produced by the hub operator.
Both the Federal Ministry of Transport, Innovation and Technology and Bohmann Publishing House shall not accept any liability for correctness.

Webdesign: BLAUGRAU MEDIA GmbH Wochenzeitschrift für Logistik und Transport